>> VIEW OTHER FEATURED PROJECTS

FREEDOM PARKWAY PROJECT

This $5.5 million project consisted of transportation engineering for 1.7 miles of 4-lane roadway with a 20-foot raised median. Along its challenging alignment, this project contained 11 box culverts, over 3,600 linear feet of sanitary sewer pipeline, over 7,500 l.f. of 12-inch water main design, over 440,000 cubic yards of unclassified excavation, two waste areas totaling 90,000 cubic yards, two major intersection designs with signalization, NPDES Erosion, Sedimentation and Pollution Control Plans, and right-of-way acquisition for six parcels. The design was completed and let for bidding within six months of our Notice-To-Proceed. We mention this project to show our experience and dedication to the transportation field and the capabilities of our highly productive design staff.